Overview
Kitchen redesign, cabinets, countertops, tiling, plumbing and electrical in one project.
Designed for real use
A beautiful kitchen that's awkward to cook in is a failure. We start with how you use the space: who cooks, how much storage you need, where appliances should go, and whether you want an open kitchen or a closed one to contain cooking smells — a popular choice in Dubai homes.
From cabinets to the last socket
- Cabinets — custom-built in moisture-resistant board with laminate, acrylic, lacquer or veneer finishes and soft-close hardware.
- Countertops — quartz, granite, porcelain slab or solid surface.
- Backsplash and floor tiling
- Plumbing — sink relocation, dishwasher and fridge water points, water filters.
- Electrical — dedicated circuits for cookers and ovens, under-cabinet lighting, extra sockets.
- Ventilation — chimney and extractor installation with proper ducting.
One team, fewer delays
Because our carpenters, plumbers and electricians are in-house, there is no waiting between trades. A typical apartment kitchen renovation can be completed in 2–4 weeks once the design is approved and materials are confirmed.
When to call us
Signs you need kitchen renovation
- Not enough storage or counter space
- Swollen or damaged cabinet doors
- Outdated layout that doesn't suit your family
- Poor lighting or too few sockets
- Preparing to sell or rent your property